{"id":3165,"date":"2015-10-06T12:57:04","date_gmt":"2015-10-06T11:57:04","guid":{"rendered":"http:\/\/www.datinstruments.com\/en\/?page_id=3165"},"modified":"2017-07-27T09:22:49","modified_gmt":"2017-07-27T08:22:49","slug":"tam-grouting","status":"publish","type":"page","link":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/","title":{"rendered":"TAM GROUTING"},"content":{"rendered":"<h2><strong><span style=\"color: #ff0000;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft  wp-image-545\" style=\"border: 0px; margin: 0px;\" title=\"Grouting\" src=\"http:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg\" alt=\"DAT instruments, dataloggers for: Jet grouting \u2013 Grouting \u2013 Cement injection \u2013 TAM grouting \u2013 Drilling \u2013 MWD \u2013 CFA \u2013 Deep mixing \u2013 Soil mixing \u2013 Vibroflotation \u2013 Diaphragm walls \u2013 Lugeon test \u2013 Mineral investigation\" width=\"220\" height=\"344\" \/>Possible situations:<\/span><\/strong><\/h2>\n<p>(1) The first tam grouting pile has been properly built with JET 4000 AME \/ I datalogger: all lifts have been injected with the required quantity of cement, at the right pressure.<\/p>\n<p>(2) The second tam grouting pile has been badly built, compromising its bearing capacity: some valves did not open, leaving gaps, either due to too low pressure or to operator\u2019s error.<\/p>\n<p>(3) The third tam grouting pile has been badly built, compromising its bearing capacity: some lifts have less quantity of cement than what it was required in the project specifications. The foundation is likely to collapse.<\/p>\n<p>&nbsp;<\/p>\n<h2><span style=\"color: #008000;\"><strong>Solution by DAT INSTRUMENTS:<\/strong><\/span><\/h2>\n<h2><span style=\"color: #008000;\"><strong><a href=\"http:\/\/www.datinstruments.com\/en\/jet-4000-ame-i\/\"><img decoding=\"async\" class=\"wp-image-390 alignright\" style=\"border: 0px; margin-top: 0px; margin-bottom: 0px;\" title=\"JET 4000 AME \/ I\" src=\"http:\/\/www.datinstruments.com\/wp-content\/uploads\/2012\/11\/DAT_image589.jpg\" alt=\"\" width=\"284\" height=\"211\" \/><\/a><\/strong><\/span><\/h2>\n<p><strong>JET 4000 AME \/ I <\/strong>datalogger:<\/p>\n<ul>\n<li><strong>Controls <\/strong>and <strong>automates <\/strong>the <strong>injector(s) <\/strong>during the piling injection of the cement, with start and stop functions of the pump(s) to keep the injection within pre-set parameters;<\/li>\n<li><strong>Records <\/strong><strong>p<\/strong><strong>ressure<\/strong>, <strong>f<\/strong><strong>low<\/strong> and <strong>v<\/strong><strong>olume<\/strong> of cement, plus <strong>date<\/strong> and <strong>time<\/strong> of work;<\/li>\n<li><strong>Provides<\/strong> detailed <strong>reports<\/strong> to document the work quality; reports are easy to access and to manage;<\/li>\n<li>Can be set up with all the <strong>project specifications  <\/strong>of the piles  to be made.<br \/>\n<strong style=\"text-align: center;\">NO NEED TO SET UP IN FIELD.<\/strong><\/li>\n<\/ul>\n<p><a href=\"http:\/\/www.datinstruments.com\/en\/files\/2012\/11\/Grouting-datasheet.jpg\"><img decoding=\"async\" class=\" wp-image-589 alignleft\" title=\"DAT instruments, JET S 104, grouting datasheet\" src=\"http:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting-datasheet2.jpg\" alt=\"DAT instruments, dataloggers for Jet grouting - Grouting - Cement injection - TAM grouting - Drilling - MWD - CFA - Deep mixing - Soil mixing - Vibroflotation - Diaphragm walls - Lugeon test - Mineral investigation\" width=\"216\" height=\"310\" \/><\/a><a href=\"http:\/\/www.datinstruments.com\/en\/files\/2013\/01\/JET-S-104-eng.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright  wp-image-486\" title=\"DAT instruments, JET S 104, grouting preview\" src=\"http:\/\/www.datinstruments.com\/en\/files\/2013\/03\/JET-S-104-sw.jpg\" alt=\"DAT instruments, dataloggers for Jet grouting - Grouting - Cement injection - TAM grouting - Drilling - MWD - CFA - Deep mixing - Soil mixing - Vibroflotation - Diaphragm walls - Lugeon test - Mineral investigation\" width=\"271\" height=\"179\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Possible situations: (1) The first tam grouting pile has been properly built with JET 4000 AME \/ I datalogger: all lifts have been injected with the required quantity of cement, at the right pressure. (2) The second tam grouting pile has been badly built, compromising its bearing capacity: some valves did not open, leaving gaps, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-3165","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.8.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>DAT instruments, TAM GROUTING<\/title>\n<meta name=\"description\" content=\"TAM Grouting datalogger prevents issues of: not open valves because of low pressure or operator\u2019s error, less cement than required in the project spec.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DAT instruments, TAM GROUTING\" \/>\n<meta property=\"og:description\" content=\"TAM Grouting datalogger prevents issues of: not open valves because of low pressure or operator\u2019s error, less cement than required in the project spec.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/\" \/>\n<meta property=\"og:site_name\" content=\"DAT instruments\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/datinstruments\" \/>\n<meta property=\"article:modified_time\" content=\"2017-07-27T08:22:49+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@DATinstruments\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/\",\"url\":\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/\",\"name\":\"DAT instruments, TAM GROUTING\",\"isPartOf\":{\"@id\":\"https:\/\/www.datinstruments.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg\",\"datePublished\":\"2015-10-06T11:57:04+00:00\",\"dateModified\":\"2017-07-27T08:22:49+00:00\",\"description\":\"TAM Grouting datalogger prevents issues of: not open valves because of low pressure or operator\u2019s error, less cement than required in the project spec.\",\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.datinstruments.com\/en\/tam-grouting\/#primaryimage\",\"url\":\"https:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg\",\"contentUrl\":\"https:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg\",\"width\":220,\"height\":344,\"caption\":\"DAT instruments, dataloggers for: Jet grouting \u2013 Grouting \u2013 Cement injection \u2013 TAM grouting \u2013 Drilling \u2013 MWD \u2013 CFA \u2013 Deep mixing \u2013 Soil mixing \u2013 Vibroflotation \u2013 Diaphragm walls \u2013 Lugeon test \u2013 Mineral investigation\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.datinstruments.com\/en\/#website\",\"url\":\"https:\/\/www.datinstruments.com\/en\/\",\"name\":\"DAT instruments\",\"description\":\"DAT instruments, datalogger for: Jet grouting - Grouting - Cement injection - TAM grouting - Drilling - MWD - CFA - Deep mixing - Soil mixing - Vibroflotation - Diaphragm walls - Hydromills - Lugeon test - Mineral investigation\",\"publisher\":{\"@id\":\"https:\/\/www.datinstruments.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.datinstruments.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.datinstruments.com\/en\/#organization\",\"name\":\"DAT instruments\",\"url\":\"https:\/\/www.datinstruments.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.datinstruments.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.datinstruments.com\/en\/files\/2019\/08\/User.jpg\",\"contentUrl\":\"https:\/\/www.datinstruments.com\/en\/files\/2019\/08\/User.jpg\",\"width\":567,\"height\":567,\"caption\":\"DAT instruments\"},\"image\":{\"@id\":\"https:\/\/www.datinstruments.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"http:\/\/www.facebook.com\/datinstruments\",\"https:\/\/x.com\/DATinstruments\",\"http:\/\/www.linkedin.com\/company\/dat-instruments\",\"http:\/\/www.youtube.com\/user\/DATinstruments\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"DAT instruments, TAM GROUTING","description":"TAM Grouting datalogger prevents issues of: not open valves because of low pressure or operator\u2019s error, less cement than required in the project spec.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/","og_locale":"en_GB","og_type":"article","og_title":"DAT instruments, TAM GROUTING","og_description":"TAM Grouting datalogger prevents issues of: not open valves because of low pressure or operator\u2019s error, less cement than required in the project spec.","og_url":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/","og_site_name":"DAT instruments","article_publisher":"http:\/\/www.facebook.com\/datinstruments","article_modified_time":"2017-07-27T08:22:49+00:00","og_image":[{"url":"http:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_site":"@DATinstruments","twitter_misc":{"Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/","url":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/","name":"DAT instruments, TAM GROUTING","isPartOf":{"@id":"https:\/\/www.datinstruments.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/#primaryimage"},"image":{"@id":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/#primaryimage"},"thumbnailUrl":"http:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg","datePublished":"2015-10-06T11:57:04+00:00","dateModified":"2017-07-27T08:22:49+00:00","description":"TAM Grouting datalogger prevents issues of: not open valves because of low pressure or operator\u2019s error, less cement than required in the project spec.","inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.datinstruments.com\/en\/tam-grouting\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.datinstruments.com\/en\/tam-grouting\/#primaryimage","url":"https:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg","contentUrl":"https:\/\/www.datinstruments.com\/en\/files\/2013\/03\/Grouting.jpg","width":220,"height":344,"caption":"DAT instruments, dataloggers for: Jet grouting \u2013 Grouting \u2013 Cement injection \u2013 TAM grouting \u2013 Drilling \u2013 MWD \u2013 CFA \u2013 Deep mixing \u2013 Soil mixing \u2013 Vibroflotation \u2013 Diaphragm walls \u2013 Lugeon test \u2013 Mineral investigation"},{"@type":"WebSite","@id":"https:\/\/www.datinstruments.com\/en\/#website","url":"https:\/\/www.datinstruments.com\/en\/","name":"DAT instruments","description":"DAT instruments, datalogger for: Jet grouting - Grouting - Cement injection - TAM grouting - Drilling - MWD - CFA - Deep mixing - Soil mixing - Vibroflotation - Diaphragm walls - Hydromills - Lugeon test - Mineral investigation","publisher":{"@id":"https:\/\/www.datinstruments.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.datinstruments.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.datinstruments.com\/en\/#organization","name":"DAT instruments","url":"https:\/\/www.datinstruments.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.datinstruments.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.datinstruments.com\/en\/files\/2019\/08\/User.jpg","contentUrl":"https:\/\/www.datinstruments.com\/en\/files\/2019\/08\/User.jpg","width":567,"height":567,"caption":"DAT instruments"},"image":{"@id":"https:\/\/www.datinstruments.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/datinstruments","https:\/\/x.com\/DATinstruments","http:\/\/www.linkedin.com\/company\/dat-instruments","http:\/\/www.youtube.com\/user\/DATinstruments"]}]}},"_links":{"self":[{"href":"https:\/\/www.datinstruments.com\/en\/wp-json\/wp\/v2\/pages\/3165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.datinstruments.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.datinstruments.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.datinstruments.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.datinstruments.com\/en\/wp-json\/wp\/v2\/comments?post=3165"}],"version-history":[{"count":0,"href":"https:\/\/www.datinstruments.com\/en\/wp-json\/wp\/v2\/pages\/3165\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.datinstruments.com\/en\/wp-json\/wp\/v2\/media?parent=3165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}